Manjunathanagara metro station

From Wikipedia the free encyclopedia

Manjunatha Nagara
Namma Metro station
General information
LocationArch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073
Coordinates13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJuly 2024; 2 months' time (July 2024)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Chikkabidarakallu
towards Madavara
Green Line
(extension by July 2024)
Nagasandra
Location
Map

Manjunatha Nagara is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway leading towards the city of Nelamangala in Karnataka. As per latest updates, this metro station is slated to be operational around July 2024.[1]

Station layout[edit]

Station Layout (TBC)

Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Nagasandra
Platform 1
Northbound
Towards ← Madavara next station is Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits[edit]

See also[edit]

References[edit]

  1. ^ Bureau, The Hindu (21 January 2024). "Green Line Nagasandra to Madavara extension likely to be operational by July". The Hindu. ISSN 0971-751X. Retrieved 22 January 2024.

External links[edit]