Line 3 (Suzhou Rail Transit)
Line 3 | |
---|---|
Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | 25 December 2019[1] |
Technical | |
Line length | 45.272 km[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]
Since 23 December 2023, with through train to/from line 11, Gexiangjie and Weiting are being served only by Line 11 trains.
Stations[edit]
Service routes | Station name | Connections | Distance km | Location | |||
---|---|---|---|---|---|---|---|
L3 | L11 | English | Chinese | ||||
● | Suzhou Xinqu Railway Station | 苏州新区火车站 | 6 ITH Tram line 2 | 0.00 | 0.00 | Huqiu | |
● | Huichanglu | 惠昌路 | |||||
● | Wenchanglu | 文昌路 | Tram line 2 (branch) | ||||
● | Changting | 长亭 | |||||
● | Tongdun | 铜墩 | |||||
● | Mayunlu | 马运路 | |||||
● | Xijinqiao | 西津桥 | 8 | ||||
● | Heshan | 何山 | |||||
● | Shizishan | 狮子山 | 1 Tram line 1 | ||||
● | Shishanlu | 狮山路 | |||||
● | Shajinqiao | 沙金桥 | |||||
● | Suoshanqiao West | 索山桥西 | 5 | ||||
● | ● | Hengshan | 横山 | ||||
● | ● | Hengtang | 横塘 | ||||
● | ● | Shihu North | 石湖北 | ||||
● | ● | Xinguo | 新郭 | Gusu | |||
● | ● | Panlilu | 盘蠡路 | 2 | Wuzhong | ||
● | ● | Baodailu | 宝带路 | 4 | |||
● | ● | Yingchunlu | 迎春路 | ||||
● | ● | Beiganglu | 北港路 | SIP | |||
● | ● | Tongyuanlu South | 通园路南 | 7 | |||
● | ● | Shupulu North | 墅浦路北 | ||||
● | ● | Dongzhenlu | 东振路 | ||||
● | ● | Jinsheqiao | 金厍桥 | 5 | |||
● | ● | Ligongdi West | 李公堤西 | 6 | |||
● | ● | Dongfangzhimen | 东方之门 | 1 | |||
● | ● | Yanyuqiao | 烟雨桥 | ||||
● | ● | Nibang | 泥浜 | ||||
● | ● | Tangzhuang | 唐庄 | 8 | |||
● | ● | Kuatang | 跨塘 | ||||
● | ● | Suzhou Yuanqu Railway Station | 苏州园区火车站 | 8 KAH | |||
● | ● | Fangwanjie | 方湾街 | ||||
● | ● | Fenghelu | 丰和路 | ||||
● | ● | Shuangmajie | 双马街 | ||||
● | ● | Fengtingdadao | 葑亭大道 | 5 11 | |||
● | Gexiangjie | 戈巷街 | |||||
● | Weiting | 唯亭 | |||||
↓ | Through service to/from Huaqiao on 11 | ||||||
Through service[edit]
Through service between Line 3 and Line 11 started on December 23, 2023.[4]
Map[edit]
Gallery[edit]
- An image of Exit 6b of Ligongdi West Station, under construction, taken a few weeks before the opening.
- An image of Exit 2 of Ligongdi West Station, under construction, taken a few weeks before the opening.
References[edit]
- ^ a b "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
- ^ a b "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
- ^ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07.
此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
- ^ "地铁S1线拟更名为11号线 预计2023年底与3号线贯通运营".